Mathematics, 01.12.2021 22:10 Chartwig4576
HCH's assembly unit has decided to use a p-Chart to monitor the proportion of defective castings produced by their production process. The control limits on these charts will be designed to include 98% of the sample proportions when the process is In Control. The operations manager randomly samples 250 castings at 12 successively selected time periods and counts the number of defective castings in the sample.
Sample Defects
17
212
38
414
58
69
78
88
912
107
Required:
a. What is the Lower Control Limit?
b. What is the Upper Control Limit?
c. What is the z score?
Answers: 3
Mathematics, 22.06.2019 06:00, isabelsmhl
Find the minimum value of p=10x+26y the constraints are x+y less than or equal to 6, 5x+y greater than or equal to 10, x+5y greater than or equal to 14
Answers: 1
Mathematics, 22.06.2019 09:30, PerksInLife
Which of the following could be the lengths of the sides of an isosceles triangle? 1. (8, 4, 8) 2. (3, 2, 9) 3. (8, 2, 9) 4. (4, 5, 3) 5. (3, 1, 7)
Answers: 3
HCH's assembly unit has decided to use a p-Chart to monitor the proportion of defective castings pro...
Mathematics, 17.06.2020 00:57
Mathematics, 17.06.2020 00:57
Physics, 17.06.2020 00:57
Mathematics, 17.06.2020 00:57
Computers and Technology, 17.06.2020 00:57