subject
Mathematics, 25.11.2021 14:00 Twitches

A contractor has two choices for billing a completed job. · $500 flat rate, regardless of the number of hours worked · $20 per hour worked The graph shows the relationship between pay per hour and number of hours worked for both scenarios. Mc029-1. Jpg What is the solution to this system of equations, and what does it mean to the contractor? The solution (0, 20) tells the contractor the minimum amount that can be charged. The solution (0, 500) tells the contractor the maximum amount that can be charged. The solution (25, 20) tells the contractor the number of hours on a job where the hourly rate is the same for both billing options. The solution (20, 25) tells the contractor the number of hours on a job where the hourly rate is the same for both billing options.

ansver
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 13:30, struckedblazing
49xy +34y - 72z. determine the degree of the polynomial
Answers: 1
image
Mathematics, 21.06.2019 19:00, mbalderp5bxjo
Billy plotted −3 4 and −1 4 on a number line to determine that −3 4 is smaller than −1 4 is he correct? explain why or why not?
Answers: 3
image
Mathematics, 21.06.2019 19:00, tanaemichel
John used linear combination to solve the system of equations shown. he did so by multiplying the first equation by -3 and the second equation by another number to eliminate the x-terms. what number did jonas multiply the second equation by? 4x-6y=23x+5y=11
Answers: 2
image
Mathematics, 21.06.2019 22:20, AliMe52
Atriangle has verticals at b(-3,0), c(2,-1), d(-1,2). which transformation would produce an image with verticals b”(-2,1), c”(3,2), d”(0,-1)?
Answers: 2
You know the right answer?
A contractor has two choices for billing a completed job. · $500 flat rate, regardless of the numbe...

Questions in other subjects: