subject
Mathematics, 30.10.2021 22:00 727

A construction company can remove 6 3/4 metric tons of dirt from a construction site in 1 7/8 hours. What is the unit rate in metric tons per hour? Write your answer as a fraction or a mixed number in simplest form.

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 16:00, AmbitiousAndProud
30 pts, will mark brainliestwhat is the period of the sinusoidal function? (picture 1)what is the minimum of the sinusoidal function? (picture2)what is the maximum of the sinusoidal function? (picture 3)
Answers: 3
image
Mathematics, 21.06.2019 18:00, terrell31
Compare the cost of the bike trips from the two companies shown. for both the cost in a linear function of the number of days which statements is true
Answers: 2
image
Mathematics, 21.06.2019 23:40, breannaasmith1122
Me d is also an option but i couldn't get it in the picture
Answers: 2
image
Mathematics, 22.06.2019 00:00, heyyyyy117
Define the type of sequence below. 7, 14, 28, 56, 112, a. neither arithmetic nor geometric b. arithmetic c. both arithmetic and geometric d. geometric
Answers: 1
You know the right answer?
A construction company can remove 6 3/4 metric tons of dirt from a construction site in 1 7/8 hours....

Questions in other subjects:

Konu
Mathematics, 06.05.2021 16:20
Konu
History, 06.05.2021 16:20
Konu
Mathematics, 06.05.2021 16:20