subject
Mathematics, 25.10.2021 16:00 htxalyssa

A group of engineers developed a new design for a steel cable. They need to estimate the amount of weight the cable can hold. The weight limit will be reported on cable packaging. The engineers take a random sample of 44 cables and apply weights to each of them until they break. The 44 cables have a mean breaking weight of 778.1 lb. The standard deviation of the breaking weight for the sample is 15.5 lb. Find the 99% confidence interval to estimate the mean breaking weight for this type cable.

( , )

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 17:00, alexandraschwartz21
Aswimming pool is a rectangle with semicircles on the end. the rectangle is 12 meters wide and 30 meters long. the diameter and width of the swimming pool are equal. sketch and label an overhead diagram of the swimming pool. find the area of the swimming pool floor.
Answers: 1
image
Mathematics, 21.06.2019 17:30, ZBSJ
Find and simplify an expression for the area of five rows of x squares with side lengths of x centimeters.
Answers: 3
image
Mathematics, 22.06.2019 00:30, mlbowman3644
Can someone me find the original price? the discount is 5% and the sale price is $68.40
Answers: 1
image
Mathematics, 22.06.2019 01:10, alondrahernande3
Do xuan nam isgoing to invest $1000 at a simple interest rate of 4% how long will it take for the investment to be worth $1040?
Answers: 1
You know the right answer?
A group of engineers developed a new design for a steel cable. They need to estimate the amount of w...

Questions in other subjects:

Konu
Geography, 06.02.2021 21:40
Konu
Mathematics, 06.02.2021 21:40
Konu
Biology, 06.02.2021 21:40
Konu
Mathematics, 06.02.2021 21:40