158 ft. An engineering company was hired to dig an underground tunnel directly from

point A to point B, which was a distance of 1.4 miles. By mistake, however, they

tunneled from point A to point C. Then they tunneled from point C to point B. If

tunneling costs about $120 million per mile, about how much money was wasted?

Show how you found your answer. (Note: 1 mile = 5,280 feet)

ansver
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 16:00, baabyylewis
Select the correct answer. in the figure, angle k measures 45°. what is the measurement of angle c? a. 38° b. 45° c. 90° d. 98°
Answers: 2
image
Mathematics, 21.06.2019 18:30, Greekfreak
To determine the number of deer in a forest a forest ranger tags 280 and releases them back
Answers: 3
image
Mathematics, 21.06.2019 22:00, shantejahtierr63961
You're locked out of your house. the only open window is on the second floor, 25 feet above the ground. there are bushes along the edge of the house, so you will need to place the ladder 10 feet from the house. what length ladder do you need to reach the window?
Answers: 3
image
Mathematics, 22.06.2019 05:30, Juancr4539
Ys is the perpendicular bisector of xz what it is the length of xs
Answers: 2
You know the right answer?
158 ft. An engineering company was hired to dig an underground tunnel directly from

po...

Questions in other subjects:

Konu
Mathematics, 04.03.2021 01:40