subject
Mathematics, 03.10.2021 16:50 nathang444

A construction worker needs to pour a rectangular slab 28 ft long, 12 ft wide, and 8 in. thick. How many cubic yards of concrete does the worker need? (Assume that the construction worker cannot buy a fraction of a cubic yard of concrete.)

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 14:50, westlakebuddy1229
If f(x) = 2x + 2 and g(x) = x? , what is (gºf)(2)?
Answers: 2
image
Mathematics, 21.06.2019 16:10, marsewilliams
20 da is equal to a. 2,000 cm. b. 2 m. c. 20,000 cm. d. 20,000 mm
Answers: 1
image
Mathematics, 21.06.2019 19:00, katherinemartinez173
Simplify. −4x^2 (5x^4−3x^2+x−2) −20x^6−12x^4+8x^3−8x^2 −20x^6+12x^4−4x^3+8x^2 −20x^8+12x^4−4x^2+8x −20x^6+12x^4+4x^3−8x^2
Answers: 1
image
Mathematics, 21.06.2019 22:00, jladinosolarsee
If tan2a=cot(a+60), find the value of a, where 2a is an acute angle
Answers: 1
You know the right answer?
A construction worker needs to pour a rectangular slab 28 ft long, 12 ft wide, and 8 in. thick. How...

Questions in other subjects: