subject
Mathematics, 03.10.2021 16:00 mylaaaa79

A manufacturer produces two models of toy airplanes. It takes the manufacturer 6 minutes to assemble model A and 9 minutes to package it. It takes the manufacturer 7 minutes to assemble model B and 5 minutes to package it. In a given
week, the total available time for assembling is 840 minutes, and the total available time for packaging is 900 minutes. Let x
be the number of model A units produced. Let y be the number of model B units produced. Shade the region corresponding
to all values of x and y that satisfy these requirements.

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 14:10, sebastianapolo5
Element x decays radioactively with a half life of 8 minutes. if there are 450 grams of element x, how long, to the nearest tenth of a minute, would it take the element to decay to 37 grams?
Answers: 2
image
Mathematics, 21.06.2019 15:50, Pbaer3087
Agreeting card company can produce a box of cards for $7.50. if the initial investment by the company was $50,000, how many boxes of cards must be produced before the average cost per box falls to $10.50?
Answers: 1
image
Mathematics, 21.06.2019 17:30, aliami0306oyaj0n
Lindsay used two points, (x, y; ) and (+2.82), to find the equation of the line, y = mx + b, that passes through the points. y2-y, first, she used the definition of slope and determined that the value of mis x, - . given this information, which expression must represent the value of b?
Answers: 2
image
Mathematics, 21.06.2019 18:50, casting479
What is the range? can’t seem to find it out
Answers: 1
You know the right answer?
A manufacturer produces two models of toy airplanes. It takes the manufacturer 6 minutes to assemble...

Questions in other subjects: