subject
Mathematics, 23.09.2021 08:40 ed72018373

Required information M4-10 to M4-12
Lakeside Inc. manufactures four lines of remote control boats and uses activity-based costing to calculate product cost.
Estimated
Activity Cost Pools Total Cost Estimated cost Driver
Machining
$581,400 19,000 machine hours
Setup
95, 175 470 batches
Quality control
147,200 920 inspections
M4-10 (Algo) Calculating Activity Rates for ABC System (LO 4-4)
Compute the activity rates for each of the following activity cost pools: (Round your answers to 2 decimal places.)
Machining
Setup Costs
Quality Control
per Machine Hour
per Batch
per Inspection

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 18:50, babyskitt
Determine if the function below is continuous. a. continuous b. not continuous, 1 hole c. not continuous, > 2 holes d. not continuous, 2 holes
Answers: 1
image
Mathematics, 21.06.2019 23:30, kreshnikolloma
Which of these angles are complementary? a. 45o and 45o b. 63o and 117o c. 45o and 135o d. 90o and 45o
Answers: 1
image
Mathematics, 22.06.2019 01:00, madelyncross24
Lines f and g are cut by the transversal d. the measure of 1 = 2x + 35 and the measure of 8 = 10x - 85. what value of x will show that lines f and g are parallel? a. 19 b. 26 c. 18 d. 15
Answers: 1
image
Mathematics, 22.06.2019 01:00, bob7220
Harry is at the depot in dover and has deliveries to make in edinburgh, glasgow and aberdeen. from dover which of the deliveries is the shortest distance?
Answers: 1
You know the right answer?
Required information M4-10 to M4-12
Lakeside Inc. manufactures four lines of remote control...

Questions in other subjects:

Konu
Arts, 10.05.2021 18:10