ORDER T
NUMBER
.
Person 4 worked for 150 minutes, at a rate represented by
1 = (...
Mathematics, 15.09.2021 06:40 tinamarie04ts
ORDER T
NUMBER
.
Person 4 worked for 150 minutes, at a rate represented by
1 = (3/800) c
Answers: 3
Mathematics, 21.06.2019 17:00, drandbone92
Shane can shovel the driveway in 4 hours, but if his sister it would take 2 hours. how long would it take taylor to shovel the driveway alone
Answers: 1
Mathematics, 21.06.2019 19:30, tiwaribianca475
Cor d? ? me ? max recorded the heights of 500 male humans. he found that the heights were normally distributed around a mean of 177 centimeters. which statements about max’s data must be true? a) the median of max’s data is 250 b) more than half of the data points max recorded were 177 centimeters. c) a data point chosen at random is as likely to be above the mean as it is to be below the mean. d) every height within three standard deviations of the mean is equally likely to be chosen if a data point is selected at random.
Answers: 1
Mathematics, 22.06.2019 00:50, india336
To diagonalize an nxn matrix a means to find an invertible matrix p and a diagonal matrix d such that a pdp d p ap or [1 3 dh epap 3 let a=-3 -5 -3 3 3 1 step 1: find the eigenvalues of matrix a "2's" step 2: find the corresponding eigenvectors of a step 3: createp from eigenvectors in step 2 step 4 create d with matching eigenvalues.
Answers: 3
Mathematics, 18.09.2021 15:30
Mathematics, 18.09.2021 15:30
Mathematics, 18.09.2021 15:30