Mathematics, 02.09.2021 20:20 jose9794
A superconducting "bullet" train is researched and tested on a track. The steepest section of the track has a rise of 1830 meters for a horizontal distance of 6100 meters. What is the grade of this section of track? 1830 meters 6100 meters
Answers: 3
Mathematics, 22.06.2019 01:30, nandinipp0303
Robert is placing sod in two square shaped areas of his backyard. one side of the first area is 7.5 feet. one side of the other area is 5.7 feet. the sod costs y dollars per square foot
Answers: 3
A superconducting "bullet" train is researched and tested on a track. The steepest section of the tr...
Mathematics, 09.12.2019 08:31
Mathematics, 09.12.2019 08:31
English, 09.12.2019 08:31
Mathematics, 09.12.2019 08:31
History, 09.12.2019 08:31
Spanish, 09.12.2019 08:31