The Farmer’s American Bank of Leesburg is planning to install a new computerized accounts system. Bank management has determined the activities required to complete the project, the precedence relationships of the activities, and activity time estimates, as shown in the following table:
Activity Activity Description Activity Predecessor a m b
A Recruiting - 5 8 17
B System development - 3 12 15
C System training A 4 7 10
D Equipment training A 5 8 23
E Manual system test B, C 1 1 1
F Preliminary system changeover B, C 1 4 13
G Computer-personnel
interface D, E 3 6 9
H Equipment modification D, E 1 2.5 7
I Equipment testing H 1 1 1
J System debugging &
installation F, G 2 2 2
K Equipment changeover J, I 5 8 11
a. Determine the expected time for each activity.
b. Draw the activity network showing the ET, ES, EF, LS and LF.
c. State the critical path for this project and the expected time for its completion.
d. Determine the project standard deviation to two decimal places
Answers: 3
Mathematics, 21.06.2019 15:30, dessssimartinez6780
Name these type of angles shown check all that applies
Answers: 2
Mathematics, 21.06.2019 17:50, jamielytle
The length and width of a rectangle are consecutive even integers the area of the rectangle is 120 squares units what are the length and width of the rectangle
Answers: 1
Mathematics, 21.06.2019 21:30, jasminelynn135owmyj1
The measures of the legs of a right triangle are 15m and 20m . what is the length of the hypotenuse
Answers: 1
Mathematics, 21.06.2019 23:30, awsomeboy12345678
Harry the hook has 7 1/3 pounds of cookie dough. she uses 3/5 of it to bake cookie. how much cookie dough does she use to make cookie?
Answers: 1
The Farmer’s American Bank of Leesburg is planning to install a new computerized accounts system. Ba...
Mathematics, 02.09.2020 19:01
Mathematics, 02.09.2020 19:01
Geography, 02.09.2020 19:01
Mathematics, 02.09.2020 19:01
Mathematics, 02.09.2020 19:01
Biology, 02.09.2020 19:01