Mathematics, 09.08.2021 20:30 kokilavani

A project consists of five activities. Naturally the paint mixing precedes the painting activities. Also, both ceiling painting and floor sanding must be done prior to floor buffing. Optimistic Most Probable Pessimistic Activity Time (hr) Time (hr) Time (hr) Floor sanding 3 4 5 Floor buffing 1 2 3 Paint mixing 0.5 1 1.5 Wall painting 1 2 9 Ceiling painting 1 5.5 7 ​ Construct the PERT/CPM network for this problem on a rough paper. What is the expected completion time of this project? What is the probability that the project can be completed within 9 hr.?

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 13:50, mallyosburn
2-3 6. use your equation to find how high tyler will have to climb to scale the peak. (4 points: 2 points for correctly substituting values, 2 points for the correct height)
Answers: 3
image
Mathematics, 21.06.2019 15:30, LadyHolmes67
When i add money am i supposed to make it like this 7+12 or 7.00+12.00 because i got 19 dollars for my answer
Answers: 2
image
Mathematics, 21.06.2019 17:30, chaparro0512
Astore sells two types of radios. one type sells $87 and the other for $119. if 25 were sold and the sales were $2495, how many of the $87 radios were sold a) 5 b) 20 c) 15 d)10
Answers: 2
image
Mathematics, 21.06.2019 18:30, 987654321156
The volume of gas a balloon can hold varies directly as the cube of its radius. imagine a balloon with a radius of 3 inches can hold 81 cubic inches of gas. how many cubic inches of gas must be released to reduce the radius down to 2 inches?
Answers: 1
You know the right answer?
A project consists of five activities. Naturally the paint mixing precedes the painting activities....

Questions in other subjects:

Konu
Mathematics, 24.03.2021 21:50
Konu
Spanish, 24.03.2021 21:50