subject
Mathematics, 09.08.2021 09:20 phebusadrian01

Invers proportion it takes 12 workers 3 weeks to complete four project. each project take same numbers of hours

a) at this rate how long would it take fifteen workers to complete ten project? = 6 weeks

b) the ten projects need to be completed in under four weeks. what is the minimum number of workers be needed, given that they all work at the same rate as the original workers ? ( i know answer i need axplaning ) :]

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 14:00, butt1562
This is so harddd! solve. 1 + 1 = solve 4 + 4 = solve 3 x 3
Answers: 2
image
Mathematics, 21.06.2019 15:00, FlayMaster101
Answer soon(fast) 15 pts-brainliest? for right answer with small explination a restaurant catered a party for 40 people. a child’s dinner (c) cost $11 and an adult’s dinner (a) cost $20. the total cost of the dinner was $728. how many children and adults were at the party? use the table to guess and check.(i couldn't get the graph onto the question)                                8 children and 32 adults9 children and 31 adults10 children and 30 adults12 children and 28 adults
Answers: 1
image
Mathematics, 21.06.2019 16:00, twil85459
Find the average speed of a rabbit that runs a distance of 22 m in a time of 1.8 s .
Answers: 1
image
Mathematics, 21.06.2019 16:30, lanakay2006
We have enough material to build a fence around a station that has a perimeter of 180 feet the width of the rectangular space must be 3 1/4 feet what must the length be
Answers: 1
You know the right answer?
Invers proportion it takes 12 workers 3 weeks to complete four project. each project take same numb...

Questions in other subjects:

Konu
Mathematics, 24.02.2021 14:00
Konu
Business, 24.02.2021 14:00
Konu
Mathematics, 24.02.2021 14:00