A construction project is broken down into the following 10 activities: ACTIVITY IMMEDIATE PREDECESSOR TIME (WEEKS)
1 — 4
2 1 2
3 1 4
4 1 3
5 2, 3 5
6 3 6
7 4 2
8 5 3
9 6, 7 5
10 8, 9 7
b-1. Find the critical path.
1-3-5-8-10
1-2-5-8-10
1-3-6-9-10
1-4-7-9-10
b-2. How many weeks will the project take to complete?
c. If activities 1 and 10 cannot be shortened, but activities 2 through 9 can be shortened to a minimum of one week each at a cost of $10,000 per week, which of the following options would reduce the project duration by four weeks? (You may select more than one answer. Single click the box with the question mark to produce a check mark for a correct answer and double click the box with the question mark to empty the box for a wrong answer.)
Cut activity 3 by 3 weeks, and then reduce activity 6 or 9 by one week. unanswered
Cut activity 5 by 4 weeks. unanswered
Reduce activities 6 and 9 by a total of 3 weeks, and then reduce activity 3 by one week. unanswered
Cut activity 4 by 3 weeks, and then reduce activity 6 or 5 by one week. unanswered
Cut activity 5 by 3 weeks, and then reduce activity 4 or 9 by one week.

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 17:30, kirsten8605
If the measure of angle 1 is 110 degrees and the measure of angle 3 is (2 x+10 degree), what is the value of x?
Answers: 2
image
Mathematics, 21.06.2019 19:00, alyssa5485
Twenty points. suppose that one doll house uses the 1 inch scale, meaning that 1 inch on the doll house corresponds to 1/2 foot for life-sized objects. if the doll house is 108 inches wide, what is the width of the full-sized house that it's modeled after? in inches and feet
Answers: 2
image
Mathematics, 21.06.2019 21:40, bella7524
Which statement is true about a number and its additive inverse? a. their product is always one. b. their sum is always one. c. they are always reciprocals of each other. d. their sum is always zero.
Answers: 1
image
Mathematics, 21.06.2019 23:00, teriateria
How can writing phrases as algebraic expressions you solve problems?
Answers: 2
You know the right answer?
A construction project is broken down into the following 10 activities: ACTIVITY IMMEDIATE PREDECES...

Questions in other subjects: