subject
Mathematics, 24.07.2021 06:00 lilchannelll4125

PLEASE HELP i have limited time on a test A company is considering designing a new and better can opener. The company estimates the probability that the new can opener will be successful is 5.8 . If it is successful, it would be able to make $200,000. Of course, the company would make nothing if it were unsuccessful. The development costs for the can opener are $76,000. What is the expected value?
-$49,000
$125,000
$49,000
$75,000

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 15:00, samantha9014
The inside wheels of a car traveling on a circular path are rotating half as fast as the outside wheels. the front two wheels are six feet apart. what is the number of feet in the path traced by the inside front wheel in one trip around the circle? express your answer in the form "k \pi", where k is an integer.
Answers: 3
image
Mathematics, 21.06.2019 16:30, shyann78
In two or more complete sentences, formulate how to use technology to calculate the appropriate regression model for the given data. you are not required to find the model, just choose the appropriate regression and explain how to use the technology. (-5,,2.,0.8), (0,-0.5), (2,-1.3), (3,-0.8), (5,2)
Answers: 2
image
Mathematics, 21.06.2019 16:30, cherish14
What could explain what happened when the time was equal to 120 minutes
Answers: 2
image
Mathematics, 21.06.2019 18:30, tangia
The base of a triangle exceeds the height by 9 inches. if the area is 180 square inches, find the length of the base and the height of the triangle.
Answers: 3
You know the right answer?
PLEASE HELP i have limited time on a test A company is considering designing a new and better can o...

Questions in other subjects:

Konu
Social Studies, 25.01.2021 21:20
Konu
Computers and Technology, 25.01.2021 21:20
Konu
Mathematics, 25.01.2021 21:20