subject
Mathematics, 22.07.2021 14:00 trenton16

A and B together can dig a big trench in 12 days. A alone can dig in 30 days . In how many day B can dig?

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 21:00, arthurdolz
Adesigner charges a one time fee of $200 plus $40 an hour for each project. write an expression to represent how much money the designer will make for a project
Answers: 1
image
Mathematics, 22.06.2019 00:30, drewje12
Which polynomial equation of least degree has -2, -2, 3, and 3 as four of its roots? (x + 2)(x - 3) = 0 (x - 2)-2(x + 3)3 = 0 (x-2 + 2)(x2- 3) = 0 (x + 2)2(x - 3)2 = 0
Answers: 2
image
Mathematics, 22.06.2019 00:30, alxiar19
Which equation could represent the relationship shown in the scatter plot? y=−3x−2 y=−3/4x+10 y=−2/3x+1 y=9x−12 scatter plot with x axis labeled variable x and y axis labeled variable y. points go from upper left to lower right.
Answers: 1
image
Mathematics, 22.06.2019 01:30, nandinipp0303
Robert is placing sod in two square shaped areas of his backyard. one side of the first area is 7.5 feet. one side of the other area is 5.7 feet. the sod costs y dollars per square foot
Answers: 3
You know the right answer?
A and B together can dig a big trench in 12 days. A alone can dig in 30 days . In how many day B can...

Questions in other subjects: