subject
Mathematics, 20.07.2021 04:00 asco0317p34v1s

A company makes 3 types of cable. Cable A requires 3 black, 3 white, and 2 red wires. B requires 1 black, 2 white, and 1 red. C requires 2 black, 1 white, and 2 red. Make a 3 x 3 matrix showing the wire requirements. Assign the cable types to the rows and the wire types to the columns. A) [2 1 2 1 2 1 2 1 3].
B) [3 3 2 1 2 1 2 1 1].
C) [3 1 2 3 2 1 2 1 2].
D) [2 1 3 1 2 1 2 1 2].

ansver
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 12:40, winterblanco
Free 100 points to whoever says “oof the porridges” if it’s not exact, your answer will be reported, first person gets brainliest
Answers: 2
image
Mathematics, 21.06.2019 16:30, cxttiemsp021
Which approach to the theory-and-research cycle does the following sequence reflect: (1) specific observations suggest generalizations, (2) generalizations produce a tentative theory, (3) the theory is tested through the formation of hypotheses, and (4) hypotheses may provide suggestions for additional observations?
Answers: 1
image
Mathematics, 21.06.2019 19:10, gurlnerd
1jessica's home town is a mid-sized city experiencing a decline in population. the following graph models the estimated population if the decline continues at the same rate. select the most appropriate unit for the measure of time that the graph represents. a. years b. hours c. days d. weeks
Answers: 2
image
Mathematics, 21.06.2019 21:00, ally7366
Roger could feed 5 walruses with 4 kilograms of fish. how many walruses could he feed with 7.2 kilograms of fish?
Answers: 1
You know the right answer?
A company makes 3 types of cable. Cable A requires 3 black, 3 white, and 2 red wires. B requires 1 b...

Questions in other subjects:

Konu
English, 16.05.2021 19:50
Konu
Mathematics, 16.05.2021 19:50