Mathematics, 20.07.2021 01:00 shermaine17
Paul can install a 300-square-foot hardwood floor in 18 hours. Matt can install the same floor in 22 hours. How long would it take Paul and Matt to install the floor working together?
4 hours
9.9 hours
13.2 hours
30 hours
Answers: 2
Mathematics, 21.06.2019 17:30, ninaaforever
The sum of two numbers is 12 and their difference is 18 what are the two numbers
Answers: 1
Mathematics, 22.06.2019 00:50, sharonsmailbagot6uas
After reading 80% of her e-mails in her inbox, danette still has m unread e-mails. which of the following expressions could represent the number of e-mails danette had in her inbox before she started reading? choose 2 answers: (choice a) 5m (choice b) 1.8m (choice c) 80m (choice d) m/0.8 (choice e) m/1−0.8
Answers: 1
Mathematics, 22.06.2019 01:30, kuadirkennedy
You have 37 coins that are nickels, dimes, and pennies. the total value of the coins is $1.55. there are twice as many pennies as dimes. find the number of each type of coin in the bank.
Answers: 1
Paul can install a 300-square-foot hardwood floor in 18 hours. Matt can install the same floor in 22...
Mathematics, 30.03.2020 17:56
English, 30.03.2020 17:56