Two workers finished a job in 12 days. How long would it take each worker to do the job by himself if one of the workers needs 10 more days to finish the job than the other worker

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 20.06.2019 18:04, jdvazquez18p7a7vs
Arectangular prism is 3 meters long, 6 meters wide, and has a height of 9 meters. what is its surface area?
Answers: 1
image
Mathematics, 21.06.2019 22:00, yay47
Worth 100 points need the answers asap first row -x^2 2x^2 (x/2)^2 x^2 x is less than 2 x is greater than 2 x is less than or equal to 2 x is greater than or equal to 2 second row -5 -5/2 4 5 •2 is less than x& x is less than 4 •2 is less than or equal to x & x is less than or equal to 4 •2 is less than or equal to x& x is less than 4 •2 is less than x& x is less than or equal to 4
Answers: 1
image
Mathematics, 21.06.2019 22:30, sipstick9411
Reinel saves 30% of every pay check. his paycheck last week was 560$. how much did reniel save last week?
Answers: 2
image
Mathematics, 21.06.2019 23:00, spaigenicole
Someone answer this asap for the first five terms of a sequence are shown. 5, 11, 23, 47, 95, . . which recursive function defines the nth term in the sequence for n > 1? a. f(n) = f(n - 1) + 6 b) f(n) = f(n - 1) + 48 c) f(n) = 3 • f(n - 1) + 1 d) f(n) = 3 • f(n - 1) - 4
Answers: 1
You know the right answer?
Two workers finished a job in 12 days. How long would it take each worker to do the job by himself i...

Questions in other subjects:

Konu
Mathematics, 03.06.2021 21:40