subject
Mathematics, 03.07.2021 22:30 lilinicholeb

if 4 men ND 7 BOYS Can do a WORK in n29 days then 12 men and 8 boys will do that work in how many days

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 17:30, CAPEPOPPA
Average acceleration: i have no idea how to do this.
Answers: 1
image
Mathematics, 21.06.2019 22:00, bobk1433
Mrs. avila is buying a wallpaper border to go on all of her kitchen walls. she wants to buy 5 extra feet of wallpaper border than she needs to be sure she has enough. she buys 55.5 feet of the border. the store owner selling the border uses the width of mrs. avila's kitchen to determine that the length of her kitchen must be 14.5 feet.
Answers: 2
image
Mathematics, 22.06.2019 02:00, keke6361
V=x^4-y^4 pick three expressions that can represent the three dimensions of the prism (each in meters)
Answers: 2
image
Mathematics, 22.06.2019 03:30, Becky81
The height above the ground (in feet) of a ball dropped from the top of a 30-foot-tall building after t seconds is given by the polynomial: ? 16t^2+30 what is the height of the ball after 1/2 second?
Answers: 3
You know the right answer?
if 4 men ND 7 BOYS Can do a WORK in n29 days then 12 men and 8 boys will do that work in how many da...

Questions in other subjects:

Konu
Biology, 16.10.2020 03:01
Konu
Mathematics, 16.10.2020 03:01