subject
Mathematics, 02.07.2021 19:10 jacamron

The Sureset Concrete Company produces concrete. Two ingredients in concrete are sand (costs $6 per ton) and gravel (costs $8 per ton). Sand and gravel together must make up exactly 75% of the weight of the concrete. Also, no more than 40% of the concrete can be sand and at least 30% of the concrete be gravel. Each day 2000 tons of concrete are produced. To minimize costs, how many tons of gravel and sand should be purchased each day

ansver
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 19:50, keigleyhannah30
Use composition to determine if (x) or h(x) is the inverse of f(x) for the limited domain x2-1.
Answers: 3
image
Mathematics, 21.06.2019 20:30, ultimatesaiyan
Answer asap ill give ! ’ a sample of radioactive material decays over time. the number of grams, y , of the material remaining x days after the sample is discovered is given by the equation y = 10(0.5)^x. what does the number 10 represents in the equation? a. the half-life of the radioactive material, in days b. the amount of the sample, in grams, that decays each day c. the time, in days, it will take for the samples to decay completely d. the size of the sample, in grams, at the time the material was discovered
Answers: 1
image
Mathematics, 21.06.2019 20:30, alannadiaz1
Two triangles can be formed with the given information. use the law of sines to solve the triangles. b = 49°, a = 16, b = 14
Answers: 3
image
Mathematics, 21.06.2019 22:00, Thejollyhellhound20
The sum of the speeds of two trains is 720.2 mph. if the speed of the first train is 7.8 mph faster than the second train, find the speeds of each.
Answers: 1
You know the right answer?
The Sureset Concrete Company produces concrete. Two ingredients in concrete are sand (costs $6 per t...

Questions in other subjects:

Konu
Biology, 19.10.2021 09:30
Konu
World Languages, 19.10.2021 09:30