American Desk Company makes desks and tables. There are 320 hours of labor available each week in the finishing room. Each table requires 2.5 hours in the finishing room,
and each desk requires 5 hours. Graph the number of cach that can be produced in one week. (Let the x-axis refer to the number of tables and the y-axis refer to the number of
desks. Graph your answer as an inequality, rememberikg that you cannot produce negative of a product.)

ansver
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 17:30, uticabadgirl
Scrub a dub toothbrushes are $4.00 each. there is a 10% discount, but there is also a 6% sales tax after the discount is applied. what is the new price after tax? round to the nearest penny
Answers: 1
image
Mathematics, 22.06.2019 02:30, aboatright7410
Witch sequence shows a pattern where each term is 1.5 times the previous term
Answers: 3
image
Mathematics, 22.06.2019 03:30, cbogrett
The lengths of the two sides of a right triangle are 5 inches and 8 inches what is the difference the possible lengths of the third side of the triangle
Answers: 1
image
Mathematics, 22.06.2019 05:00, HealTheWorld
Acabbage palmetto has a height of 80 feet. what is the approximate height of the tree in meters
Answers: 1
You know the right answer?
American Desk Company makes desks and tables. There are 320 hours of labor available each week in th...

Questions in other subjects:

Konu
World Languages, 02.03.2021 17:50
Konu
Mathematics, 02.03.2021 17:50
Konu
Mathematics, 02.03.2021 17:50