subject
Mathematics, 24.06.2021 02:50 907to760

An oil-drilling rig has dug a hole to a depth of -60 ft. after one full day and night of continuous use. The rate of the rig stayed constant over that time.
Part A: The rig will be used to dig a second hole with a depth of -150 ft. at the same rate as
before. How many hours will the rig take to complete digging the hole?

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 17:40, shaviaa
Atriangle has an area of 72 square inches. if the base of the triangle has a length of 18 inches, what is the height of the triangle? use the formula for the area of a triangle: area = (base)(height) type a numerical answer in the space provided. do not include the units or spaces in your answer.
Answers: 1
image
Mathematics, 21.06.2019 19:00, csnow
Point r divides in the ratio 1 : 3. if the x-coordinate of r is -1 and the x-coordinate of p is -3, what is the x-coordinate of q? a. b. 3 c. 5 d. 6 e. -9
Answers: 1
image
Mathematics, 21.06.2019 20:20, nunyuh69
Can some one explain this i got sent this. is this a threat i’m scared
Answers: 1
image
Mathematics, 21.06.2019 22:00, MoparorNocar061401
Find two numbers if their sum is 91 and the ratio is 6: 7?
Answers: 1
You know the right answer?
An oil-drilling rig has dug a hole to a depth of -60 ft. after one full day and night of continuous...

Questions in other subjects:

Konu
English, 30.12.2020 01:00
Konu
Mathematics, 30.12.2020 01:00
Konu
Chemistry, 30.12.2020 01:00
Konu
Chemistry, 30.12.2020 01:00