(04.06 MC) A bicycle manufacturing company makes a particular type of bike Each child bike requires 4 hours to build and 4 hours to test. Each adult bike requires 6 hours to
build and 4 hours to test. With the number of workers, the company is able to have up to 120 hours of building time and 100 hours of testing time for a week. If c
represents child bikes and a represents adult bikes, can the company build 5 child bikes and 15 adult bikes in a week.

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 17:30, Lovergirl13
Apositive number a or the same number a increased by 50% and then decreased by 50% of the result?
Answers: 3
image
Mathematics, 21.06.2019 23:00, emiliestinnett
Peter measures the angles in a triangle. he finds that the angles are 95, 10 and 75. is he correct? explain your answer
Answers: 2
image
Mathematics, 21.06.2019 23:40, guadalupemarlene2001
Which set of side lengths form a right side? a) 3ft,6ft,5ft b)50 in,48in,14in c)53m,48m,24m d)8cm,17cm,14cm
Answers: 2
image
Mathematics, 22.06.2019 00:30, Delgadojacky0206
The water company charges a residential customer $41 for the first 3,000 gallons of water used and $1 for every 200 gallons used over 3000 gallons. if the water bill was $58 how many gallons of water were usedanswersa 3400 gallonsb 6000 gallonsc 6400 gallons d 7000 gallons
Answers: 2
You know the right answer?
(04.06 MC) A bicycle manufacturing company makes a particular type of bike Each child bike requires...

Questions in other subjects: