Mathematics, 18.06.2021 05:10 sampurple123
A jean manufacturer makes three types of jeans, each of which goes through three manufacturing phases: cutting, sewing, and finishing. The number of minutes each type of product requires in each of the three phases is given below:
Jean Cutting Sewing Finishing
I 8 12 4
II 12 18 8
III 18 24 12
There are 5200 minutes of cutting time, 6000 minutes of sewing time, and 2200 minutes of finishing time each day. The company can sell all the jeans it makes and makes a profit of $4 on each Jean I, $4.50 on each Jean II, and 6 on each Jean III.
Required:
a. What number of jeans in each category should be made each day to maximize profits?
b. Formulate a linear programming problem that models the problem given above. Be sure to identify all variables used.
c. Analyze the solution.
Answers: 1
Mathematics, 21.06.2019 15:00, ejcastilllo
Let the mean of the population be 38 instances of from 6" - 9" hatchings per nest, and let the standard deviation of the mean be 3. what sample mean would have a confidence level of 95% or a 2.5% margin of error?
Answers: 1
A jean manufacturer makes three types of jeans, each of which goes through three manufacturing phase...
Chemistry, 03.03.2021 15:40
Mathematics, 03.03.2021 15:40
Mathematics, 03.03.2021 15:40
Mathematics, 03.03.2021 15:40