subject
Mathematics, 13.06.2021 18:30 KubraDskn

To complete a task in 30 days a company needs 4 people each working for 7 hours per day.
The company decides to have
5 people each working for 6 hours per day.
Assuming that each person works at the same rate,
how many days will the task take to complete?

ansver
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 20:00, ale6826
Abcd is a square. what is the measure of angle bac
Answers: 2
image
Mathematics, 21.06.2019 22:00, krandall232
Match the scale and the actual area to the area of the corresponding scale drawing. scale: 1 inch to 4 feet actual area: 128 square feet scale: 1 inch to 7 feet actual area: 147 square feet scale: 1 inch to 8 feet actual area: 256 square feet scale: 1 inch to 5 feet actual area: 225 square feet area of scale drawing scale and actual area scale drawing area: 3 square inches arrowright scale drawing area: 8 square inches arrowright scale drawing area: 4 square inches arrowright scale drawing area: 9 square inches arrowright
Answers: 2
image
Mathematics, 21.06.2019 22:00, juhavyen
Determine the domain and range of the given function. the domain is all real numbers all real numbers greater than or equal to –2{x: x = –2, –1, 0, 1, 2}{y: y = –2, –1, 0, 1, 2}. the range is all real numbers all real numbers greater than or equal to –2{x: x = –2, –1, 0, 1, 2}{y: y = –2, –1, 0, 1, 2}.
Answers: 1
image
Mathematics, 22.06.2019 01:00, mandy9386
Def rotates 90 clockwise about point a to create d’ e’ f’. therefore, which equation must be true ?
Answers: 2
You know the right answer?
To complete a task in 30 days a company needs 4 people each working for 7 hours per day.
The...

Questions in other subjects:

Konu
Mathematics, 11.11.2020 22:20
Konu
Mathematics, 11.11.2020 22:20
Konu
Mathematics, 11.11.2020 22:20
Konu
Mathematics, 11.11.2020 22:20
Konu
Social Studies, 11.11.2020 22:20