A project has the following activities and related data: Activity. Time (Weeks) Immediate Activity Predecessor Crash Most Most Most Cost Maximum Optimistic likely Pessimistic ($000) Crashable (a) (m) (C) per weeks week A None 1 3 11 3 1 00 None 4 5 6 4 1 С А 5 6 7 1 2 D А 4 5 12 1 2 1 E B 6 11 2 1 B 1 2 15 F 1 3 2 4 6 6 G CD 2 3 4 2 1 2 H EF G CD 2 4 6 6 N H EF 2 3 3 4 4 2 1 34a. (20 points) a. Compute the expected value E(t) and variance V(t) for all activities
Activity A B C D E F G H
E(t) weeks
V(t) weeks^2
b. there are three critical paths ACG, ADG, and BEH, all with expected project completion time time E(t) = 14 weeks. Compute the variance of project completion time for each path
V(ACG)=
V(ADG)=
V(BEH)
c. Assume that the project completion time T is normally distributed with mean E(T)=14 weeks and variance V(T) approximately by the maximum of the variances of the three individual critical paths. Determine the time X in weeks for which there is a 40% probability that the project can be completed on or before x.
d. List all alternatives and the respective costs for shortening the project by one week and identify the best alternative that has the minimum costs. Hint there are 8 alternatives
Alternative cost
the best alternative is..
e. For activity i, let Xi be the earliest finishing time and Yi be the number of weeks shortened. Formulate the linear program for minimizing the cost for shortening the project by one week

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 18:00, nanny2204p4ipj9
Acompany wants to reduce the dimensions of its logo by one fourth to use on business cards. if the area of the original logo is 4 square inches, what is the area of the logo that will be used on the business cards?
Answers: 1
image
Mathematics, 21.06.2019 20:00, tefanyc13
Parabolas y=−2x^2 and y=2x^2 +k intersect at points a and b that are in the third and the fourth quadrants respectively. find k if length of the segment ab is 5.
Answers: 1
image
Mathematics, 21.06.2019 20:20, Lindy5657
Which of the following best describes the delian problem?
Answers: 3
image
Mathematics, 21.06.2019 20:20, makaylacroy02
Drag the tiles to the correct boxes to complete the pairs. not all tiles will be used. identify the domain for each of the given functions.
Answers: 1
You know the right answer?
A project has the following activities and related data: Activity. Time (Weeks) Immediate Activity P...

Questions in other subjects:

Konu
Mathematics, 31.08.2021 18:40
Konu
Mathematics, 31.08.2021 18:40