subject
Mathematics, 24.05.2021 14:00 ally3724f

Seven manufacturing companies agreed to implement a time management program in hopes of improving productivity. The times, in minutes, it took the companies to produce the same quantity and type of part are listed below. Does this information indicate the program decreased production time? Assume normal population distributions. Use α= 0.05. Company 1 2 3 4 5 6 7
Before(1) 75 112 89 95 80 105 110
After(2) 70 110 88 100 80 100 99

Required:
a. What is the level of significance? State the null and alternate hypothesis. Find or estimate the P-value. Sketch the sampling distribution to show the area corresponding to the P-value.
b. Based on your answers above, will you reject or fail to reject the null hypothesis? State the conclusion in the context of the problem.

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 18:00, duplerk30919
What is the difference between the predicted value and the actual value
Answers: 1
image
Mathematics, 21.06.2019 19:00, thegreentnt5025
1. which of the following algebraic equations is equivalent to ? x^n = a a^n = x a^x = n x^a = n 2. 16^1/4= 1/2 2 4 3. (-36)^1/2= -6 1/6 no real number 4. 8^2/3= 4 8 16√2 )^5/2= 7,776 1/7,776 no real number 6. m ^ the square root of a^2m simplified is: 7. the square root of 3^3 times the square root of 2 simplified and in radical form is:
Answers: 2
image
Mathematics, 22.06.2019 00:30, lifewkeya
The base of the rectangle pyramid is 13 inches long and 12 inches wide the height of the pyramid is 18 inches . what is the volume of the pyramid ?
Answers: 2
image
Mathematics, 22.06.2019 02:00, FaygoMango
Prove the following(cot0+cosec0)[tex](cot0 + cosec0) { }^{2} = \frac{1 + cos0}{1 - cos0} [/tex]
Answers: 1
You know the right answer?
Seven manufacturing companies agreed to implement a time management program in hopes of improving pr...

Questions in other subjects:

Konu
English, 05.11.2020 02:40
Konu
English, 05.11.2020 02:40