subject
Mathematics, 22.05.2021 14:00 minervica

Assume that 20 parts are checked each hour and that X denotes the number of parts in the sample of 20 that require rework. Parts are assumed to be independent with respect to rework. (a) If the percentage of parts that require rework remains at 1%, what is the probability that hour 10 is the first sample at which X exceeds 1? (b) If the rework percentage increases to 4%, what is the probability that hour 10 is the first sample at which X exceeds 1? (c) If the rework percentage increases to 4%, what is the expected number of hours until X exceeds 1?

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 21:20, caseypearson377
Sam is a waiter at a local restaurant where he earns wages of $5 per hour sam figures that he also eams about $3 in tips for each person he serves sam works 6 hours on a particular day. if n represents the number of people sam serves that day, which of the following functions could sam use to figure ehis total earings for the do o a. en) = 30 o b. en) = 5n+ 18
Answers: 2
image
Mathematics, 21.06.2019 21:40, pakabigail4796
The point a is at –2 and the point b is at 7. marissa would like to divide this line segment in a 4: 3 ratio, and she would like to use the formula x = (x2 – x1) + x1. what values should she substitute into the formula? a = a + b = x1 = x2 =
Answers: 2
image
Mathematics, 21.06.2019 23:30, jose477
Which shows the first equation written in slope-intercept form? 1/2 (2y + 10) = 7x
Answers: 1
image
Mathematics, 22.06.2019 02:00, dawood7068
Which is the best estimate of the product of 0.9 x 0.88? 0 0.25 0.5 1
Answers: 2
You know the right answer?
Assume that 20 parts are checked each hour and that X denotes the number of parts in the sample of 2...

Questions in other subjects: