subject
Mathematics, 19.05.2021 02:40 LuckyCharms988

The amount of time required to assemble a television varies inversely with the number of robots used on the assembly line. If 20 robots are able to assemble a television in 40 minutes, how many minutes would it take 32 robots working at the same speed to assemble the television?


The amount of time required to assemble a television varies inversely with the number of robots use

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 20:30, bullockarwen
Which coefficient matrix represents a system of linear equations that has a unique solution ? options in photo*
Answers: 1
image
Mathematics, 22.06.2019 01:30, sliverx201
If 5x - 2 = -12, then x = a) -50 b) -4.4 c) -2.8 d) -2
Answers: 1
image
Mathematics, 22.06.2019 02:00, joejoefofana
The trapezoid is composed of a rectangle and two triangles. what is the area of the rectangle? what is the total area of the triangles? what is the area of the trapezoid? a) 48 cm2; 32 cm2; 80 cm 2 b) 48 cm2; 16 cm2; 64 cm 2 c) 128 cm2; 32 cm2; 160 cm 2 d) 128 cm2; 16 cm2; 144 cm 2
Answers: 1
image
Mathematics, 22.06.2019 02:30, aidenmanpig
Match each set of points with the quadratic function whose graph passes through those points
Answers: 1
You know the right answer?
The amount of time required to assemble a television varies inversely with the number of robots used...

Questions in other subjects:

Konu
Chemistry, 22.10.2020 23:01
Konu
Business, 22.10.2020 23:01