subject
Mathematics, 18.05.2021 18:00 famouzgal

A construction company bought 5/6 of a pound of sand mixed with 2 2/3 pounds of cement. A construction worker used 1 1/3 pounds of the mixture. how much mixture is left? A. 3 1/2 B.2 1/3 C. 2 1/6 D. 4 5/6

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 17:30, amourrrblackkkk
Which of the following is correct interpretation of the expression -4+13
Answers: 2
image
Mathematics, 21.06.2019 23:30, Ecosey123
I'm a polygon i have no parallel lines i am formed 3 line segments i have one right angle two of my angles are angles what am i
Answers: 1
image
Mathematics, 21.06.2019 23:30, maddo36
Answer each of the questions for the following diagram: 1. what type of angles are these? 2. solve for x. what does x equal? 3. what is the measure of the angles?
Answers: 1
image
Mathematics, 22.06.2019 00:20, lawrencebenoit7194
❤️ (geometry) does the construction demonstrate how to copy an angle correctly using technology a) yes; the distance between points a and f was used to create circle h b) yes; the distance between points f and g was used to create circle h c)no; the distance between points a and f was used to create circle h d) no; the distance between points f and g was used to create circle h
Answers: 2
You know the right answer?
A construction company bought 5/6 of a pound of sand mixed with 2 2/3 pounds of cement. A constructi...

Questions in other subjects: