The following is a linear programming formulation of a labor planning problem. There are four overlapping shifts, and management must decide how many employees to schedule to start work on each shift. The objective is to minimize the total number of employees required while the constraints stipulate how many employees are required at each time of day. The variables X1 - X4 represent the number of employees starting work on each shift (shift 1 through shift 4). MIN X1 + X2 + X3 + X4

s. t. X1 + X4 ≥ 12 (on duty during shift 1)
X1 + X2 ≥ 15 (on duty during shift 2)
X2 + X3 ≥ 16 (on duty during shift 3)
X3 + X4 ≥ 14 (on duty during shift 4)
X1, X2, X3, and X4 ≥ 0

Given the optimal solution: X1* = 13, X2* = 2, X3* = 14, X4* = 0, how many workers would be assigned to shift 2?

a. 13
b. 12
c. 14
d. 15
e. 2

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 17:00, afletcher2000
Jasmine wants to eat at 8: 00pm her meal takes 65mins to cook what time does she need to put the meal in the oven
Answers: 2
image
Mathematics, 21.06.2019 21:40, Fangflora3
The sides of a parallelogram are 24cm and 16cm. the distance between the 24cm sides is 8 cm. find the distance between the 16cm sides
Answers: 3
image
Mathematics, 21.06.2019 21:50, spookymod8967
What is the 17th term in the arithmetic sequence in which a6 is 101 and a9 is 83
Answers: 3
image
Mathematics, 22.06.2019 04:40, misa11234
Yasmin purchased 6 heads of cabbage that each weighed 2 3/8 pounds how much did the cabbage way all together
Answers: 1
You know the right answer?
The following is a linear programming formulation of a labor planning problem. There are four overla...

Questions in other subjects:

Konu
Mathematics, 19.11.2020 15:00
Konu
Biology, 19.11.2020 15:00
Konu
Computers and Technology, 19.11.2020 15:10