Mathematics, 06.05.2021 23:00 kannon46
The table below shows the labor charges of an electrician for jobs of different lengths.
Number of Labor Charges
Hours (n) (C)
Which function represents the situation?
C (n) =35n + 25
C (n) = 25n +35
O C (n) = 25n +30
o C (n) = 35n + 40
Answers: 2
Mathematics, 21.06.2019 19:00, milhai0627a
Acompany manufactures large valves, packed in boxes. a shipment consists of 1500 valves packed in 75 boxes. each box has the outer dimensions 1.2 x 0.8 x 1.6 m and the inner dimensions 1.19 x 0.79 x 1.59 m. the boxes are loaded on a vehicle (truck + trailer). the available capacity in the vehicle combination is 140 m3. each valve has a volume of 0.06 m3. - calculate the load factor on the box level (%). - calculate the load factor on the vehicle level (%). - calculate the overall load factor (%).
Answers: 1
The table below shows the labor charges of an electrician for jobs of different lengths.
Number of...
English, 28.10.2020 22:40
Arts, 28.10.2020 22:40