subject
Mathematics, 05.05.2021 22:00 valeriegarcia12

14. The time required to complete a job varies inversely as the number of people working.
It takes 4 hours for 7 electricians to wire a
building. How long would it take 3
electricians to do the job?
A. 1 hr 43 min
C. 7 hr 30 min
B. 5 hr 15 min
D. 9 hr 20 min
inn

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 14:00, brookeguilford
If benito is selecting samples of five values from the table, which row will result in the greatest mean? row 1 row 2 row 3 row 4
Answers: 2
image
Mathematics, 21.06.2019 17:00, trinityanne1738
Two streets intersect at a 30- degree angle. at the intersection, the are four crosswalks formed that are the same length. what type of quadrilateral is formed by the crosswalks?
Answers: 2
image
Mathematics, 21.06.2019 19:00, kaylanweston
Could someone with number 1 and 2
Answers: 1
image
Mathematics, 21.06.2019 19:00, Echo009
45 was divided by a power of ten to get 4.5. what power of ten was it divided by? people 4.5
Answers: 3
You know the right answer?
14. The time required to complete a job varies inversely as the number of people working.
It...

Questions in other subjects:

Konu
Mathematics, 12.12.2020 16:50
Konu
Geography, 12.12.2020 16:50
Konu
Social Studies, 12.12.2020 16:50
Konu
Mathematics, 12.12.2020 16:50
Konu
Mathematics, 12.12.2020 16:50