subject
Mathematics, 05.05.2021 17:50 Animallover100

La empresa los manzanas exporta manzanas o varios paises del mundo, el lunes tiene que trasladar 300 cajones. Puede contratar camiones con capacidad para 50 cajones que cobran 150 por viaje, o camiones con capacidad de 60 cajones por 180 por viaje, cual camion le conviene contratar

ansver
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 16:30, IkweWolf4431
How to choose the sign of the radical in the denominator of the formula for the distance from a point to a line.
Answers: 2
image
Mathematics, 21.06.2019 17:00, karina1466
What is the value of the expression 9+n/3-6 when n = 12? 1. 5. 7. 12.
Answers: 1
image
Mathematics, 21.06.2019 20:30, alannadiaz1
Two triangles can be formed with the given information. use the law of sines to solve the triangles. b = 49°, a = 16, b = 14
Answers: 3
image
Mathematics, 21.06.2019 20:50, brea2006
An automobile assembly line operation has a scheduled mean completion time, μ, of 12 minutes. the standard deviation of completion times is 1.6 minutes. it is claimed that, under new management, the mean completion time has decreased. to test this claim, a random sample of 33 completion times under new management was taken. the sample had a mean of 11.2 minutes. assume that the population is normally distributed. can we support, at the 0.05 level of significance, the claim that the mean completion time has decreased under new management? assume that the standard deviation of completion times has not changed.
Answers: 3
You know the right answer?
La empresa los manzanas exporta manzanas o varios paises del mundo, el lunes tiene que trasladar 300...

Questions in other subjects:

Konu
Mathematics, 10.10.2019 19:50
Konu
Biology, 10.10.2019 19:50
Konu
Mathematics, 10.10.2019 19:50