subject
Mathematics, 03.05.2021 18:30 tylermorse3775

One irrigation system needs about 3 times as long to complete a job as another irrigation system. When both systems operate at the same time, the job can be completed in 9 hours. How much time is required for the faster system to complete the job by itself?

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 17:00, gymnastlyfe123
Solve 2x+y=3 x+y=5 in substitution method
Answers: 1
image
Mathematics, 21.06.2019 19:00, lex112592
Samantha is growing a garden in her back yard. she spend $90 setting up the garden bed and buying the proper garden supplies. in addition, each seed she plants cost $0.25. a. write the function f(x) that represents samantha's total cost on her garden. b. explain what x represents. c. explain what f(x) represents. d. if samantha plants 55 seeds, how much did she spend in total?
Answers: 2
image
Mathematics, 21.06.2019 20:30, alannadiaz1
Two triangles can be formed with the given information. use the law of sines to solve the triangles. b = 49°, a = 16, b = 14
Answers: 3
image
Mathematics, 22.06.2019 00:00, mikisims
Y+ 2/y is it a polynomial in one variable or not? and if so, why?
Answers: 1
You know the right answer?
One irrigation system needs about 3 times as long to complete a job as another irrigation system. Wh...

Questions in other subjects:

Konu
History, 03.12.2021 16:30
Konu
Mathematics, 03.12.2021 16:30