Mathematics, 03.05.2021 15:10 cookie1701

ramesh can complete a piece of work in 10 days he worked for 4 days and left. if dinesh complete the remaining part of the work ,how much work was done by dinesh​

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 15:30, jaasminfloress
Complete the statements about the system of linear equation respresented by the tables the equation respented the left table is
Answers: 2
image
Mathematics, 21.06.2019 21:30, Harriche
The perimeter of a rectangular lot of land is 436 ft. this includes an easement of x feet of uniform width inside the lot on which no building can be done. if the buildable area is 122 ft by 60 ft, determine the width of the easement. select one: a. 9 feet b. 18 feet c. 4.5 feet d. 7 feet
Answers: 3
image
Mathematics, 21.06.2019 21:30, kira3039
Aculture started with 4,000 bacteria. after 5 hours, it grew to 5,200 bacteria. predict how many bacteria will be present after 19 hours. round your answer to the nearest whole number.
Answers: 1
image
Mathematics, 22.06.2019 03:00, foziasif9525
Gia opened two savings accounts at two different banks. one account earns an annual 3.4% simple interest, and the other earns half as much. if she deposited $500 in each account, how much total interest will she have earned in 5 years? a. $34.00 b. $25.50 c. $51.00 d. $510.00
Answers: 1
You know the right answer?
ramesh can complete a piece of work in 10 days he worked for 4 days and left. if dinesh complete the...

Questions in other subjects:

Konu
Mathematics, 27.02.2020 22:59