Mathematics, 01.05.2021 06:20 Tylobones
If a building contractor hires 8 day laborers and concrete finisher, his payroll for the day is $1414. If he hires 1 day laborer and 4 concrete finishers, his daily cost is $913. Find the daily wage for each type of worker. Solve the problem using matrices.
Answers: 1
Mathematics, 21.06.2019 16:30, danjan9084
One of the same side angles of two parallel lines is 20° smaller than the other one. find the measures of these two angles.
Answers: 3
Mathematics, 21.06.2019 20:00, Chen5968
The distribution of the amount of money spent by students for textbooks in a semester is approximately normal in shape with a mean of $235 and a standard deviation of $20. according to the standard deviation rule, how much did almost all (99.7%) of the students spend on textbooks in a semester?
Answers: 2
If a building contractor hires 8 day laborers and concrete finisher, his payroll for the day is $1...
Mathematics, 07.09.2021 15:50
English, 07.09.2021 15:50
Arts, 07.09.2021 15:50
Mathematics, 07.09.2021 15:50
Biology, 07.09.2021 15:50