B. x=4.2
Mathematics, 28.04.2021 23:30 caspab7
Find the value of x needed to make the equation True. 3/4(20x-8)-3=54
A. x=3.8
B. x=4.2
C. x=4
D. x=3.3
Answers: 2
Mathematics, 21.06.2019 12:40, rubesh7552
If a • b*2 = 1.8 x 10*-7, and c•b/d = 7.2 x 10*-4, find the value of a•d*2/c*2
Answers: 1
Mathematics, 21.06.2019 20:20, studyowl9192
Elena is paid a constant rate for each hour she works. the table shows the amounts of money that elena earned for various amounts of time that she worked.
Answers: 2
Mathematics, 21.06.2019 20:50, brea2006
An automobile assembly line operation has a scheduled mean completion time, μ, of 12 minutes. the standard deviation of completion times is 1.6 minutes. it is claimed that, under new management, the mean completion time has decreased. to test this claim, a random sample of 33 completion times under new management was taken. the sample had a mean of 11.2 minutes. assume that the population is normally distributed. can we support, at the 0.05 level of significance, the claim that the mean completion time has decreased under new management? assume that the standard deviation of completion times has not changed.
Answers: 3
Mathematics, 22.06.2019 00:10, chloeholt123
What 8/12+8/11 in another way than and improper fraction
Answers: 2
Find the value of x needed to make the equation True. 3/4(20x-8)-3=54
A. x=3.8
B. x=4.2
B. x=4.2
Mathematics, 16.11.2019 08:31
Mathematics, 16.11.2019 08:31
Mathematics, 16.11.2019 08:31
History, 16.11.2019 08:31
Mathematics, 16.11.2019 08:31