subject
Mathematics, 28.04.2021 17:40 drandbone92

The cost function for the Seattle factory is given by the following piecewise function. That is in the cost function, where x is the number of units produced. The plants mum capacity is 42,000 units
per day.
0.35 if * < 8,000
0.75 if 8,000 < x < 20,000
0.83 -
(200,000) F 20.000 <<<
Sketch a graph to model Seattle's cost structure over the domain 10.42000). Be sure to label the
axes and any endpoints where the graph breaks. (s points)

ansver
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 18:00, cashhd1212
The given dot plot represents the average daily temperatures, in degrees fahrenheit, recorded in a town during the first 15 days of september. if the dot plot is converted to a box plot, the first quartile would be drawn at __ , and the third quartile would be drawn at __ link to graph: .
Answers: 1
image
Mathematics, 21.06.2019 21:10, koolgurl2003
Starting at home, emily traveled uphill to the hardware store for 606060 minutes at just 666 mph. she then traveled back home along the same path downhill at a speed of 121212 mph. what is her average speed for the entire trip from home to the hardware store and back?
Answers: 1
image
Mathematics, 22.06.2019 00:00, kimberly185
In a timed typing test lara typed 63 words per minute. estimate the number of words she should be able to type in half in hour show your work
Answers: 2
image
Mathematics, 22.06.2019 00:30, Ramirez72
If you were constructing a triangular frame, and you had wood in the length of 4inches, 4 inches, and 7 inches, would it make a triangle? would you be able to create a frame from these pieces of wood? yes or no. explain your mathematical thinking
Answers: 2
You know the right answer?
The cost function for the Seattle factory is given by the following piecewise function. That is in t...

Questions in other subjects:

Konu
Chemistry, 11.02.2021 17:20
Konu
Mathematics, 11.02.2021 17:20
Konu
Health, 11.02.2021 17:20