The Edward James Toy Company uses a Kanban system to make plastic wheels that are a component of several toys. The waiting time for a container of the wheels during production is 0.25 day; average processing time is 0.15 day per container. Each container holds 200 wheels. The company uses 2,000 wheels a day in the production of its products. Use the information in Case 6.1. Using a policy variable of 5%, calculate the number of Kanban containers needed for the wheels.

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 16:00, floressavanna15
Choose the point slope form of the equation below that represents the like that passes through the points (-6,4) and (2, 0)
Answers: 1
image
Mathematics, 21.06.2019 16:00, alexandergoetz8239
The level of co2 emissions, f(x), in metric tons, from the town of fairfax x years after they started recording is shown in the table below. x 2 4 6 8 10 f(x) 26,460 29,172.15 32,162.29 35,458.93 39,093.47 select the true statement.
Answers: 1
image
Mathematics, 21.06.2019 18:30, andrewmena05
Kayla wants to find the width, ab, of a river. she walks along the edge of the river 65 ft and marks point c. then she walks 25 ft further and marks point d. she turns 90° and walks until her location, point a, and point c are collinear. she marks point e at this location, as shown. (a) can kayla conclude that δ and δ are similar? why or why not? (b) suppose de = 15 ft. what can kayla conclude about the width of the river?
Answers: 2
image
Mathematics, 21.06.2019 18:50, beeboppity
7. the area of the playing surface at the olympic stadium in beijing isof a hectare. what area will it occupy on a plan drawn to a scaleof 1: 500?
Answers: 3
You know the right answer?
The Edward James Toy Company uses a Kanban system to make plastic wheels that are a component of sev...

Questions in other subjects:

Konu
Biology, 06.12.2021 19:30
Konu
Mathematics, 06.12.2021 19:30