subject
Mathematics, 25.04.2021 07:40 jacksonshalika

30 men can do a piece of work in 40 days . How long will it take to complete the work if 5 men are reduced? (Ans - 48 days ) Do step by step​

ansver
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 14:10, bl88676
An energy plant is looking into putting in a system to remove harmful pollutants from its emissions going into earth's atmosphere. the cost of removing the pollutants can be modeled using the function c = 25000p/100 -p what is the vertical asymptote?
Answers: 1
image
Mathematics, 21.06.2019 19:20, hahah265
Suppose that a households monthly water bill (in dollars) is a linear function of the amount of water the household uses (in hundreds of cubic feet, hcf). when graphed, the function gives a line with slope of 1.65. if the monthly cost for 13 hcf is $46.10 what is the monthly cost for 19 hcf?
Answers: 3
image
Mathematics, 21.06.2019 21:00, kdawg203
Yahir designs bracelets. he uses between 9 and 15 red and yellow beads in the ratio of 2 red bead to 5 yellow beads. drag the beads into the container to meet these requirements
Answers: 2
image
Mathematics, 22.06.2019 00:00, GERIANNCAYER
Aclothing designer is selecting models to walk the runway for her fashion show. the clothes she designed require each model’s height to be no more than y inches from 5 feet 10 inches, or 70 inches. which graph could be used to determine the possible variance levels that would result in an acceptable height, x?
Answers: 2
You know the right answer?
30 men can do a piece of work in 40 days . How long will it take to complete the work if 5 men are r...

Questions in other subjects: