subject
Mathematics, 30.01.2020 09:05 tamya12234

If it takes 7 people a total of 8 days to dig a ditch, how many people would it take to dig the ditch in half a day?

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 19:40, love0000
Atextile fiber manufacturer is investigating a new drapery yarn, which the company claims has a mean thread elongation of 12 kilograms with a standard deviation of 0.5 kilograms. the company wishes to test the hypothesis upper h subscript 0 baseline colon mu equals 12 against upper h subscript 1 baseline colon mu less-than 12 using a random sample of n equals 4 specimens. calculate the p-value if the observed statistic is x overbar equals 11.8. round your final answer to five decimal places (e. g. 98.76543).
Answers: 3
image
Mathematics, 21.06.2019 22:30, alvaradorosana05
Shannon drove for 540 minutes. if she traveled 65 miles per hour, how many total miles did she travel?
Answers: 2
image
Mathematics, 21.06.2019 23:50, BreBreDoeCCx
You so much whoever answers with accuracy •the parent function of the graph of f(x) is the square root function, which was reflected across the x-axis. which of the following is the equation of f(x)?
Answers: 1
image
Mathematics, 22.06.2019 00:00, deidaraXneji
Table of values relation g values x, y 2,2 /3,5 /4,9 /5,13 which ordered pair is in g inverse? a(-2,2) b(-3,-5) c)4,9) d( 13,5)
Answers: 3
You know the right answer?
If it takes 7 people a total of 8 days to dig a ditch, how many people would it take to dig the ditc...

Questions in other subjects:

Konu
Social Studies, 07.10.2020 22:01
Konu
Mathematics, 07.10.2020 22:01
Konu
World Languages, 07.10.2020 22:01