subject
Mathematics, 10.12.2019 01:31 jhonnysoriano9053

Need steps to; the number 60 is 40% of ?

an assignment is completed by 32 clerks in 22 days. assuming that all the clerks work at the rate of speed, the number of clerks that would be needed to complete this assignment in 16 days is?

ansver
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 15:00, kayleenfifep3hgi4
Pete is making decorations for a dinner party. the instructions tell him to use 9 flowers for a medium-sized decoration. complete each statement to adjust the flowers for different-sized decorations based on these instructions.
Answers: 2
image
Mathematics, 21.06.2019 17:10, ieyaalzhraa
The random variable x is the number of occurrences of an event over an interval of ten minutes. it can be assumed that the probability of an occurrence is the same in any two-time periods of an equal length. it is known that the mean number of occurrences in ten minutes is 5.3. the appropriate probability distribution for the random variable
Answers: 2
image
Mathematics, 21.06.2019 18:00, wbrandi118
Solve the equation x/4 - 5= -8 -27 -12 -7 12
Answers: 2
image
Mathematics, 21.06.2019 23:00, ReveenatheRaven2296
The distance between two points is 6.5cm and scale of map is 1: 1000 what's the distance between the two points
Answers: 1
You know the right answer?
Need steps to; the number 60 is 40% of ?

an assignment is completed by 32 clerks in 22...

Questions in other subjects:

Konu
English, 24.11.2019 00:31