subject
Mathematics, 21.09.2019 17:30 gizmo50245

Two teams of workers were scheduled to produce 680 parts in a month. the first team produced 20% more parts than planned and the second team produced 15% more than planned. the two teams together produced 118 parts more than planned. how many parts was each team supposed to produce according to the plan?
max points up for grabs

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 13:30, onlymyworld27
The quadratic function h(t) = -16.1t^2 + 150 models a balls height, in feet, over time, in seconds, after its dropped from a 15 story building. from what height in feet was the ball dropped?
Answers: 2
image
Mathematics, 21.06.2019 14:00, angellv917
At the many chips cookie company they are serious about the number of chocolate chips in their cookies they claim that each cookie hasn't c chips. if their claim is true there will be 200 chips in 10 cookies
Answers: 2
image
Mathematics, 21.06.2019 16:30, ikgopoleng8815
11. minitab software was used to find the lsrl for a study between x=age and y=days after arthroscopic shoulder surgery until an athlete could return to their sport. use the output to determine the prediction model and correlation between these two variables. predictor coef se coef t p constant -5.054 4.355 -1.16 0.279 age 0.2715 0.1427 1.9 0.094 r-sq = 31.16%
Answers: 2
image
Mathematics, 21.06.2019 20:00, kedest
What is the radical expression that is equivalent to the expression 27 1 over 5?
Answers: 3
You know the right answer?
Two teams of workers were scheduled to produce 680 parts in a month. the first team produced 20% mor...

Questions in other subjects: