subject
Mathematics, 27.11.2019 04:31 KariSupreme

4workers require 5.5 m of mortar for 3 days when working 8 hours a day.
how much m mortar can 6 workers work by working 2 hours each 10 hours?

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 18:00, ash0470
Sara can take no more than 22 pounds of luggage on a trip. her suitcase weighs 112 ounces. how many more pounds can she pack without going over the limit?
Answers: 1
image
Mathematics, 21.06.2019 19:10, Lujfl
Which ordered pair is a solution of the equation? y + 5 = 2(2+1) choose 1 answer ® only (5,10 ® only (-1,-5) © both (5, 10) and (-1,-5) 0 neither
Answers: 1
image
Mathematics, 21.06.2019 21:30, camosloppy3150
Aboard 60 in. long is cut two parts so that the longer piece is 5 times the shorter. what are the length of the two pieces?
Answers: 1
image
Mathematics, 21.06.2019 23:30, heybro12
The perimeter of an equilateral triangle is 4 cm more than the perimeter of a square and the length of a side of the triangle is 8 cm more than the length of a side of the aware. find the length of a side of the equilateral triangle
Answers: 1
You know the right answer?
4workers require 5.5 m of mortar for 3 days when working 8 hours a day.
how much m mortar can 6...

Questions in other subjects: