subject
Mathematics, 05.10.2019 23:30 mccartney33

at roberto’s construction site, the crew can frame a wall in 35 minutes and frame the opening for a door in 21 minutes. the crew needs 9 loads of materials for each wall and 13 loads of materials for each door. one day the crew worked for 595 minutes. and used 267 loads of materials. which system of equations could be used to find the number of doors. d. and walls. w, they framed?
a 35w + 9w = 595 35d + 13d = 267
b 21w + 35d = 595 9w+ 13d= 267
c 35w + 21d = 595 13w+ 9d = 267
d 35w + 21d = 595 9w+ 13d= 267

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 13:00, mahagonylabeyta
Adice is rolled 5 times. how many possible rolls are there? ( determine the number of outcomes using only the fundamental counting principal )
Answers: 1
image
Mathematics, 21.06.2019 16:00, lLavenderl
5,600 x 10^3 = a) 560 b) 5,000,600 c) 5,600,000 d) 56,000
Answers: 2
image
Mathematics, 21.06.2019 20:00, Kira4585
What is the ratio of the length of an object in yards to the length of the same object in miles?
Answers: 3
image
Mathematics, 21.06.2019 21:00, ijohnh14
Suppose a gym membership has an initial enrollment fee of $75 and then a fee of $29 a month. which equation models the cost, c, of the gym membership for m months?
Answers: 1
You know the right answer?
at roberto’s construction site, the crew can frame a wall in 35 minutes and frame the opening for a...

Questions in other subjects:

Konu
Mathematics, 22.09.2019 01:30