Mathematics, 24.08.2019 02:20 rileyeddins1010
Aconstruction company is planning to bid on a building contract. the bid costs the company $1900. the probability that the bid is accepted is 1/10. if the bid is accepted, the company will make $94000 minus the cost of the bid.
a. what is the expected value in this situation?
Answers: 1
Mathematics, 21.06.2019 19:00, anonymous115296
How many solutions does the nonlinear system of equations graphed bellow have?
Answers: 1
Mathematics, 21.06.2019 21:00, bloodmoonangel01
Deepak plotted these points on the number line. point a: –0.3 point b: – 3 4 point c: – 11 4 point d: –0.7 which point did he plot incorrectly?
Answers: 2
Mathematics, 21.06.2019 23:00, Faizalcell2120
Aremote-controlled boat can travel at 4 feet per second in calm water. the boat traveled 48 feet with the current, and then it traveled 16 feet against the current in the same amount of time. how fast is the current?
Answers: 1
Aconstruction company is planning to bid on a building contract. the bid costs the company $1900. th...
Computers and Technology, 24.07.2019 17:00
History, 24.07.2019 17:00
History, 24.07.2019 17:00
Social Studies, 24.07.2019 17:00
Social Studies, 24.07.2019 17:00