subject
Mathematics, 09.04.2021 03:50 Camill0310

(10 pts) A four-lane freeway (two lanes in each direction) is located on rolling terrain and has 12-ft lanes, no lateral obstructions within 6 ft of the pavement edges, and there are 2 ramps within 3 miles upstream of the segment midpoint and 3 ramps within 3 miles downstream of the segment midpoint. A weekday directional peak-hour volume of 1800 vehicles (familiar users) is observed, with 700 arriving in the most congested 15-min period. Ifa level of service no worse than C is desired, determine the maximum number of heavy vehicles that can be present in the peak-hour traffic stream.

ansver
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 19:40, kajtazi1157
In angle pqr find the measure of
Answers: 1
image
Mathematics, 21.06.2019 23:30, alyssasnyderrr
Which pair of numbers is relatively prime? a. 105 and 128 b. 130 and 273 c. 205 and 350 d. 273 and 333
Answers: 3
image
Mathematics, 22.06.2019 00:00, scottmn
What expression is equivalent to (84+16)
Answers: 1
image
Mathematics, 22.06.2019 00:00, shey89
Cole says the distance between points (-5,0) and (0,-5)is 5 units. is he correct? explain why or why not.
Answers: 1
You know the right answer?
(10 pts) A four-lane freeway (two lanes in each direction) is located on rolling terrain and has 12-...

Questions in other subjects:

Konu
Mathematics, 13.02.2020 20:47