subject
Mathematics, 09.04.2021 02:30 nessuhbae6731

United Aluminum Company of Cincinnati produces three grades (high, medium, and low) of aluminum at two mills. Each mill has a different production capacity (in tons per day) for each grade, as follows:
Mill
Aluminum
Grade 1 2
High 6 2
Medium 2 2
Low 4 10
The company has contracted with a manufacturing firm to supply at least 12 tons of high-grade aluminum, 8 tons of medium-grade aluminum, and 5
tons of low-grade aluminum. It costs United $6,000 per day to operate mill 1 and $7,000 per day to operate mill 2. The company wants to know the
number of days to operate each mill in order to meet the contract at the minimum cost.
Formulate a linear programming model for this problem.

ansver
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 15:00, rosezgomez97
The radical equation 2+√2x-3 = √x+7 has a solution set [x= a0} and an extraneous root x = a1.
Answers: 3
image
Mathematics, 21.06.2019 15:30, allysongonzalezlove0
Two blends of tea are mixed to make a blend that will be sold at the fair. black tea sells for $2.20 per pound and orange pekoe tea sells for $3.00 per pound. how much of each should be used to obtain a 4lb blend selling for $2.50 per pound?
Answers: 1
image
Mathematics, 21.06.2019 20:30, danizara8
The sum of these consecutive integers is equal to 9 less than 4 times the least of the integer. find the three integers
Answers: 1
image
Mathematics, 21.06.2019 20:30, shelbylynn17
The function show two sisters' savings account and the rate at which they plan to deposit money
Answers: 3
You know the right answer?
United Aluminum Company of Cincinnati produces three grades (high, medium, and low) of aluminum at t...

Questions in other subjects:

Konu
Mathematics, 03.02.2020 13:45